Question: What Is A Door Schedule

A door schedule is a document, which has all the information a joiner will require in selecting the correct door for a designated position, as well as the correct ironmongery that has to be fitted to each door.

What are door schedules in construction?

A door schedule is just a fancy word for a list of all the door types within a projects. They are usually presented on a spreadsheet and are especially useful for large residential or commercial projects where there are a number of different doors which are repeated on each level.

What is a door window schedule?

A window schedule is similar to a door schedule in that it provides an organized presentation of the pertinent window characteristics. Window schedules include quantity, type, model, manufacturer, size, rough opening, materials, glazing, and finish. There is also usually a column for remarks/notes (Figure 9.5).

What is a door hardware schedule?

hardware schedule. A table indicating precise types of hardware (such as hinges, hooks, closers, etc.) required for doors, windows, cabinets, and other features.

Why is door scheduling needed?

Scheduling makes door furniture installation easy Window and door schedules are a convenient way of presenting complex information about the different door and window sizes and types that are specified on the contract documents to ensure proper installation.

What is an architectural schedule?

A schedule as applied to construction working drawings is an organized method of presenting general notes or lists of materials, building components (doors, windows, etc.), equipment, and so forth in a drawing in tabulated form.

What does scheduling mean in construction?

Scheduling in construction projects is the process of listing of tasks, activities, milestones with a planned start and finish date. Proper scheduling would ensure the completion of the project on time and within budget. Not only does it outline the pace of the work but also how the tasks are executed.

What is a schedule in a construction document?

Based on 10 documents 10. Construction Schedule means a schedule for construction of the Project in accordance with the Approved Plans, which schedule shall reflect Final Completion of the Project by the Developer by the Completion Deadline.

What is a room schedule?

A schedule of accommodation is an itemised list of accommodation facilities and provisions required by the end user of a building project. It will usually be developed by the consultant team during the concept design stage. Room location (for example, building name / floor).

What is panel door?

Definition of panel door : a door having panels framed by stiles and rails of greater thickness — compare flush door.

What is a schedule drawing?

A schedule as applied to construction working drawings is an organized method of presenting general notes or lists of materials, building components (doors, windows, etc.), equipment, and so forth in a drawing in tabulated form.

How do you label a door on a floor plan?

Standard symbols used in floor plans. DOORS: Doors are indicated on house plans with a line perpendicular to the wall and with a quarter circle, which shows the swing of the door. SANITARY ITEMS: These symbols show the size and location of basins, sinks and toilets.

What is a glazing schedule?

A glazing schedule is a detailed list of glass and mirror types, sizes, and installation details.

What is a door submittal?

The definition of a door hardware submittal is a collection of documents that contain all the pertinent information to complete a project. It is imperative the door hardware schedule is correct as several sub-contractors, i.e., painters, masons, framers & electricians, use the schedule to help in their field of work.

What is a hardware group?

Hardware were an American funk supergroup consisting of Buddy Miles, Bootsy Collins and Stevie Salas. It featured Mudbone Cooper, Bernard Fowler and George Clinton on backing vocals, and was produced by Bill Laswell.

What is the purpose of a door jamb?

The primary purpose of the door jambs, and the door frame as a whole, is to provide a lasting support for the door. When hung, the door relies on this framing. The door jambs and other components of the frame are installed with care to ensure that the door hangs level to the floor.

What does a finish schedule look like?

A Room Finish Schedule takes each of the abbreviated symbols and communicates where each product goes within the building. It lists the room number and name in relationship to the following areas within a space: Floor, Wall Base, North Wall, East Wall, South Wall, West Wall, Ceiling.

What is schedule and specification?

The Schedule Specification has come to be known as the section or part of a specification that defines the contractor’s obligation with respect to the production and maintaining of the contractually required construction schedule.

What information can be found on a manufacturers window schedule?

Window frame manufacturers produce a range of readily available frames. Their sizes are detailed on a schedule. A typical schedule details the appearance of the window frame when viewed from the outside. It also shows the finished height and width of the frame.

What is task scheduler used for?

The Task Scheduler service allows you to perform automated tasks on a chosen computer. With this service, you can schedule any program to run at a convenient time for you or when a specific event occurs.

What is fixed window?

Fixed windows (often called a picture window) is a standard window that is non-operational. As such, these windows do not have a handle, hinges, or any operable hardware. Fixed windows permit light to enter while remaining closed to the exterior environment (unlike an operable window, which can open and close).