Quick Answer: How To Install Metal Drip Edge

Does drip edge go over or under underlayment?

According to most building codes and manufacturer recommendations, the drip edge should be installed beneath the underlayment along the eaves of the roof. But over the underlayment along the rake edges of the roof. Understanding the proper way to install the drip edge will only get you so far.

Do you need a drip edge with metal roofing?

A drip edge is not needed for metal roofing. If you make sure to overhang your metal roofing at least an inch, the drip edge is not necessary at the eaves and rakes. If the metal roof is hanging over an inch, the water will be directed away from the fascia anyway if at a slant.

How much should a metal roof overhang the drip edge?

A typical metal roof overhang may be 2 to 4 inches, or even less. Some slight overhang is recommended, in conjunction with a drip edge flashing, to prevent water from getting under the roofing and onto underlying wood.

Do you put drip edge on before tar paper?

Installing roof drip edge flashing properly The best way is to install the roof drip edge only along the eaves first, then place ice-and-water barrier (in the snowbelt) or felt paper (underlayment) over the drip edge. This lets any water that gets on the roof run down the underlayment and over the drip edge.

Where should drip edge be installed?

Drip edge is installed around the whole perimeter of the roof. It is used to hold the underlayments down and create a watertight seal around the edge of the roof. Only the face of the metal is seen and is usually just white one to one and half inch stripe located right under the shingles and above the fascia.

How far should drip edge be from fascia?

Drip edge height: 1 5/8″ Drip edge lip extension: 1/2″ Recommended drainage gap: 1/4″ (approx) spaced off of the fascia board.

Is drip edge on roof necessary?

Without a drip edge, water may end up beneath the shingles and may cause damage to various parts of the home. Though your home may not have originally had a drip edge installed, drip edges are now required by most building codes across North America to protect homes from damage.

Do you need to put tar paper under a metal roof?

Metal roof underlayment is an important component of a metal roofing system. Some might choose to skip using underlayment to save money. However, the metal roof underlayment acts as an added layer of protection. The short answer is yes, your metal roof does need underlayment .

Should there be a gap between drip edge and fascia?

The best installation method is to leave a gap between the drip edge and the fascia board, about the width of a finger. The shingles should also overhang the drip edge 3⁄8 to 1/2 an inch.

Can you install drip edge without removing gutters?

If the home has no gutter, the drip edge will prevent the water from running down the fascia and onto or into the soffit cavity. However, without the drip edge, the water sticks to shingles, potentially working its way under the shingles to cause a leak.

Can you install new drip edge over old drip edge?

Replacing Drip Edge Eave Strips: Align one end of the lower eave strip even with the edge of the roof decking. Lift up roof shingles, and nail the eave strip in place with galvanized roofing nails. Overlap the other pieces of eave strip by at least 1” and nail them in place.

How do you attach drip edge to an existing roof?

Make sure the outer edge extends over the gutter. If it doesn’t, pull the drip edge out slightly from under the shingles. Secure the drip edge with roofing cement. Apply a continuous bead of cement along the top of the drip edge, then press down on the shingle.

What do you put down under metal roofing?

The traditional and most common material used for roof underlayment on a steep-slope metal roof is non-perforated, asphalt-impregnated felt underlayment. There are several types of felt underlayment including both organic reinforced and inorganic reinforced.

How many inches do you overlap metal roofing?

Install Metal Panels Align the first metal roofing panel so that it overlaps the edging by 1/2 to 3/4 of an inch and is square to the roof line. Be sure the larger edge is laid so that the small edge of the next panel will overlap it.

What kind of nails do you use for drip edge?

The drip edge is nailed in place using 1-1/2 galvanized roofing nails. A felt-tip marker works great for marking cuts. And, again, prying open the end with a small flat bar allows the pieces to overlap cleanly.

How do you seal the ends of a corrugated roof?

Insert a tube of butyl caulking into a caulk gun and snip the end off using sharp scissors. Apply a 1/4-inch wide bead of caulk over the seam where the two panels overlap. Work your way across the entire roof to apply caulk to all remaining seams to seal them.

Is eave trim the same as drip edge?

Eave trim is used when a gutter is not required. The bottom leg of the eave trim has a kick out that is designed to keep water away from the wall. Eave trim is also referred to as drip edge or eave flashing.