Table of Contents
How do you prepare the ground for an above ground pool?
How to Prep Ground for an Above-Ground Pool Choose the best area of your yard to set up your pool. Mark the perimeter of the pool area. Remove all sod and other vegetation from the area. Determine the lowest point of the pool area. Create a wood level.
What is the best thing to put under an above ground pool?
Concrete is probably the best option since it is usually 100% level and smooth. Also, grass can’t grow through concrete and animals and bugs can’t damage or burrow through it either. Grass or dirt is also another great option, as long as it has been properly leveled and you’ve killed off the grass first.
Is it hard to install above ground pool?
You can install an above ground pool in just a few days. You will need the help of few people and can make it a great weekend project for family members and friends. We often get asked if any special tools are required. Regular household tools are all that is required.
How do I start my above ground pool for the first time?
Step 1 – Clear off the water, debris and anything else from the pool cover. Step 2 – Remove the pool cover. Step 3 – Pull the winter plugs and accessories out. Step 4 – Top up the water in your pool. Step 5 – Reinstall the pool ladder. Step 6 – Prepare the pool filtration system. Step 7 – Power your filtration system up.
How many bags of sand do I need for a 15 foot pool?
How Much Sand Will I Need For Pool Installation? Amount for Sand Base with SAND COVE Amount for Sand Base with FOAM COVE 12′ Round 1.00 0.75 15′ Round 1.50 1.00 18′ Round 2.00 1.50 21′ Round 2.50 2.00.
Is it OK to put above ground pool on concrete?
The good news is, yes, you can install your above ground pool on concrete if a sand or soil base is not possible. An inch or so drop is acceptable, but any major drop can cause the pool to collapse or even get damaged. If there is a slight dip, use a shim to level things off.
How many inches of sand do I need for an above ground pool?
The general rule is that there should be a two to three-inch base of sand under an above ground pool.
How long does it take to put in an above ground pool?
The Installation Process The installation of an above ground pool can generally be completed by an experienced pool installation crew in about 4-6 hours.
Can I install a pool myself?
DIY pool installation is hard work but not difficult; and after the job is complete you can be proud to say you built your own inground pool. All of your family and friends can now enjoy your hard work in the backyard escape you designed and built.
Do you need to shock a new above ground pool?
Every pool is different, and pools don’t need to be shocked, unless they need to be shocked – to remove bacteria, algae, chloramines or other contaminants, or to help clear cloudy pool water or some other water problem.
Do I need to shock my pool when I first fill it?
At first you’ll add chlorine in what’s called “shock” levels – an extra heavy dose to start your pool off. A shock dose coupled with extra circulation will ensure that all the water gets treated properly in the beginning. Now it’s time to keep the water hardness in check, otherwise known as alkalinity.
What chemicals do I put in my above ground pool for the first time?
Chemicals Needed for Pool Start Ups Stain & Scale Preventer. Granular Shock Chlorine. Chlorine Tablets. pH Increaser and/or pH Decreaser. Alkalinity and/or Calcium Increaser. Cyanuric Acid (Stabilizer) Algaecide and Clarifiers if needed. Complete Test Kit or Test Strips.
What happens if ground is not level for pool?
What happens if an above ground pool is not level, though? If an above ground pool is not level, the water’s weight can cause damage to the walls and liner. As a result, your pool will collapse, potentially causing property damage or personal injury.
What’s the easiest way to level ground for a pool?
STEP 1: Determine your location and remove any large rocks or debris. STEP 2: Place 2x4s on the site and place a level on top. STEP 3: Add or take away soil until the ground is level. STEP 4: Repeat the process until the entire area is flat. STEP 5: Rake any remaining rocks or debris and tamp the ground.
What to put under a pool to level it?
The most common materials to use as a base for above ground pools include concrete pads, commercial pads, sand, solid foam, carpet padding, and flooring underlayment.
Do you need sand for above ground pool?
Sand is the recommended base material upon which an aboveground pool should sit. Sand is used under an aboveground pool to protect the pool’s vinyl liner from rocks and objects that could tear the liner. Also, sand under an aboveground pool acts as cushioning for its floor, making it more comfortable for feet.
What sand is best for leveling a pool?
Mason Sand, For Your Pool’s Base It is very fine and should not contain any rocks or pebbles. This will create a very smooth bottom and is the most popular method to use when installing an above ground pool.
How do I calculate pool sand?
Volume = (width x length x depth) x 0.037 For a rectangular pool that’s 18 feet long by 9 feet wide, you’d need at least 1 cubic yard of sand for your base.