You can easily calculate cubic yardage by converting all three dimensions of your material into yards and multiplying them. For example, if you dig up a flower bed that is 9 feet long, 3 feet wide and 12 inches deep, you will have one cubic yard of dirt.
How do I calculate cubic yards?
Length in feet x Width in feet x Depth in feet (inches divided by 12). Take the total and divide by 27 (the amount of cubic feet in a yard). The final figure will be the estimated amount of cubic yards required.
How do you figure cubic yards of gravel?
The formula: Number of Cubic Yards = Length (in feet) Width (in feet) Depth (in feet) ÷ 27. Simply multiply the three dimensions together to find the number of cubic feet, then divide by 27 to find the number of cubic yards.
How do I calculate yards of dirt?
Cubic yards are used to measure the materials we provide, such as topsoil, sand, pit run, and gravel. We’ll need to know how many cubic square yards of the product you will require for your project. This is the basic formula: length [ft] x width [ft] x depth [ft] = cubic sq.
How many square feet are in a cubic yard?
If you want your cubic yards to be described in square feet, multiply the cubic yard number by 27. This is because a yard is three feet, and a cubic measure is obtained by multiplying three numbers together (3 x 3 x 3 = 27).
How do I calculate how much stone I need?
In the construction world, most materials are measured in cubic yards. Multiply the length (L), in feet, by the width (W), in feet, by the height (H), in feet, and divide by 27. This number is how many cubic yards of crushed stone you need.
How many yards of concrete do I need for a 24×24 slab?
For example, for a concrete slab that is 24′ X 24′ X 4”, simply enter 4 in the Thickness/Depth field, 24 in the Width field, and 24 in the Length field. Click “Calculate”. Your answer should be 7.11 yards. Note: The Concrete Volume Calculator can also be used to determine yardage for aggregate products.
How deep should you lay gravel?
Decorative aggregates should be laid at a depth of 50mm. This ensures proper coverage without revealing the surface below. Laying the gravel too deep will mean you sink into the surface and it becomes difficult to walk across.
How many yards of dirt are in a dump truck?
Dump Truck Cubic Yardage – The Basics While there is room for variance, most full-size dump trucks have a capacity of between 10 and 16 cubic yards.
How many yards is in a cubic yard?
ENDMEMO 1 cubic yard = 1 yards 1 yards = 2 cubic yard = 1.2599 yards 2 yards = 3 cubic yard = 1.4422 yards 3 yards = 4 cubic yard = 1.5874 yards 4 yards = 5 cubic yard = 1.71 yards 5 yards =.
How do you calculate soil volume?
To estimate soil volume for any area, all you need is a tape measure. “The basic formula is simple: Length x Width x Height = Volume,” says Michael Dean, co-founder of Pool Research. Then divide the number of cubic feet by 27. So one cubic yard = 27 cubic feet = 1,728 cubic inches.
How do I know how much soil I need?
To get the amount of cubic feet of soil instead of cubic yards, you would take you measurements in feet & multiply the length x width x depth = how many cubic feet of product you need to fill the volume of this garden or raised bed.
How many wheelbarrow loads are in a cubic yard?
Depending upon your wheelbarrow size (i.e. 2 or 3 cubic feet per wheelbarrow load), it will take 9 to 14 full loads to equal 1 cubic yard.
What is a yard of soil?
To measure a cubic yard of dirt in your garden, you take the length and width of the plot of land where you want to place the soil (in feet). This will require exactly 27 cubic feet of soil (12 x 9 = 108 and 3/12=0.25, so 108 x 0.25 = 27). This will be equally to exactly 1 cubic yard of soil.
How many cubic yards is a 10×10?
Once you come up with the number you will then divide it by 27, Which is the number of cubic feet in a cubic yard. The amount you will need for a 10 x 10 slab is 1.3 cubic yards, we always add an extra 10% to allow for any slab depth variations or spills that may occur.
How do you convert square feet to cubic feet?
Square feet: You can find the area or square footage of a space by multiplying the length and width. Then multiply this figure by the height to find the cubic space, or cubic footage, within the object.
How many yards of stone do I need calculator?
Please enter the measurements below and press “Calculate” to receive the approximate number of cubic yards needed for the specified area.Building Stone Calculator. AGGREGATES FOR GROUND COVER (PER CUBIC YARD) DEPTH COVERAGE (STONE SOLD BY THE TON) 1” 300 SQ/FT PER YARD 2” 150 SQ/FT PER YARD 3” 100 SQ/FT PER YARD.
How much 2b stone do I need?
Calculate 2B Limestone Coverage (Square feet) 400 sq ft Volume (Cubic yards) 2.5 cu yd Estimated amount (Pounds) 5,951 lb Estimated amount (Tons) 2.98 ton Amount +15% compression 3.42 ton.
How many bags of stone do I need?
Bags or Bulk There are 54 bags of stone or soil per 1 cubic yard. There are 27 1 cubic foot bags or 18 1.5 cubic foot bags of mulch per yard. Consider a ½ cubic foot bag of stone or soil weighs about 50 lbs and will cover 2 square feet at 3″ deep.