QA

How To Cure Asphalt Faster

Water down your driveway or parking lot on hot days to cool and temporarily harden the asphalt. Asphalt softens and hardens as temperatures rise and fall. Watering it down is helpful, but not mandatory. If soapsuds should appear, do not be alarmed.

What temperature does asphalt cure?

Asphalt starts to cure once it cools, typically at about 220 degrees Fahrenheit; once it reaches 185 degrees, asphalt becomes too stiff and dense for proper compaction.

Should I hose down my new asphalt driveway?

Even when fully cured, asphalt pavement can sometimes soften in extreme heat, or harden faster as temperatures drop. To temporarily harden the pavement, you can water down the surface with a garden hose. If soapsuds appear, don’t be worried. This is a reaction between the chlorine in the water and the asphalt.

Is it OK to rain on new asphalt?

In general, asphalt cannot be installed when it is raining. When rain comes into contact with fresh asphalt, it causes the oil to rise to the surface which can affect the curing time and the finished product. If asphalt is paved while it’s raining, it can reduce the overall quality of the asphalt.

Why do you water new asphalt?

Even when cured, asphalt can sometimes soften in extremely hot weather and harden as temperatures fall. To temporarily harden hot asphalt, you can water it down with a garden hose. This is a reaction between the diesel fuel found in asphalt and the chlorine found in some city water.

Can cold patch asphalt be heated?

Cold Patching Cold patch is really only a quick, temporary fix for a tough break. Cold patch does not need to be heated or sustained at a certain warm temperature. It is mixed and applied at the current ambient temperature.

How long does asphalt take to fully cure?

Since asphalt needs time to harden and cure, usually 6-12 months, your parking lot or driveway will remain soft and pliable until then. You may walk on the new pavement immediately, but keep automobile traffic off of it for at least 3 full days and longer in hotter temperatures.

How cold is too cold for asphalt?

During initial application, the asphalt should still be at least 220 to 290-degrees Fahrenheit. If the asphalt dips below approximately 185-degrees Fahrenheit before compaction is complete, its consistency stiffens up too much to finish the job properly.

How long should you stay off new asphalt?

Normally, 24-hours is all that is required to use your new asphalt surface. In very warm weather, we recommend staying off the fresh asphalt for 1 – 2 days, as the surface cools.

Should I spray my new asphalt driveway with water?

Watering a New Asphalt Driveway Cooling down your asphalt driveway with water is recommended when outside temperatures are over 80°, as when it’s as hot as this, the asphalt can soften. Cold water will effectively stop the softening, and harden your driveway temporarily.

Why is my new asphalt driveway not smooth?

If your asphalt isn’t smooth and there are loose rocks scattered over the surface, or if you can kick loose small bits of asphalt or aggregate, it’s very likely your pavement wasn’t compacted properly. Asphalt compaction is extremely important because it removes the air from your asphalt.

Can you pressure wash new asphalt?

Homeowners can use a pressure washer to clean their asphalt but should always use caution to not damage the asphalt and should always reseal after a thorough cleaning.

How long should asphalt cure before rain?

Generally, new asphalt can get wet after 24 hours, with two to three days being ideal. Rain is the enemy of asphalt when paving. Rain will make asphalt dry slower, and working during rain will damage asphalt in most cases. So, when paving, try to look for a few sunny days before rain.

How soon can you seal a new asphalt driveway?

If you’ve recently installed a new driveway, wait at least 90 days to a year to ensure the sealant doesn’t damage the asphalt. Sealcoating a new driveway too early may trap oils within the asphalt, resulting in a driveway that is too soft or flexible.

Can you pave in the winter?

Asphalt paving projects utilize hot-mix asphalt, so it is not ideal to pave in the winter. Hot-mix asphalt must remain hot to compact and perform properly. If the ambient and ground temperatures are too low, they will chill the hot-mix asphalt while it is in transport from the production plant to your property.

How soon after asphalt is laid should it be sealed?

After laying asphalt, you should wait at least 30 days before sealing your commercial parking lot. For residential parking lots, it is best to wait 90 days. Otherwise, you risk sealing your new asphalt before it is hard enough to withstand elements like power steering.

How do you take care of a new asphalt driveway?

To get the most life and best appearance from an asphalt driveway, clean the driveway at least twice a year. Use a stiff broom and strong hose spray to remove all dirt and debris. Seal-coat the asphalt every two to five years to ensure an attractive, water-resistant surface.

How do you care for new asphalt?

Caring For Your New Asphalt Driveway Do not drive on your new driveway for 3-5 days. Wait up to 14 days before parking on your new driveway. And when you do, only park on it during the cool part of the day.