Question: How Much Is A Truck Load Of Concrete

A truckload of concrete costs $800 to $1,300 for 8 to 10 cubic yards. Add $10 per load for every mile past a certain radius, set by the delivery company. You’ll often pay a surcharge of $25 per cubic yard for fuel when you don’t order a full truck.

How much does it cost to pour a 24×24 slab of concrete?

A typical 24×24 garage slab costs between $3,057 and $5,944 with prices ranging from $5.31 to $8.31 per square foot for a 4” reinforced slab of concrete, and $6.83 to $10.32 per square foot for a 6” slab of reinforced concrete.

How much concrete is in a concrete truck?

Each cubic yard costs about $65. However, a fully loaded cement truck will hold 10 cubic yards—and partial “short” loads cost $15 to $20 extra for every cubic yard less than a full load.

Is it cheaper to pour your own concrete?

Is It Cheaper to Pour Concrete Yourself? Whether you’re pouring concrete countertops or a patio out back, it may be cheaper to pour concrete yourself rather than hiring someone. The materials needed to pour concrete yourself cost about $1.76 per square foot, based on data from Porch.com.

How much concrete do I need for a 30×30 slab?

18 yards of 3000 psi concrete mix @ 135.00 per yard. Wire mesh reinforcement. A double row of #4 rebar around the edges. Labor to form the slab.

How much concrete do I need for a 10×10 slab?

The amount you will need for a 10 x 10 slab is 1.3 cubic yards, we always add an extra 10% to allow for any slab depth variations or spills that may occur.

How many yards of concrete do I need for a 24×24 slab?

For example, for a concrete slab that is 24′ X 24′ X 4”, simply enter 4 in the Thickness/Depth field, 24 in the Width field, and 24 in the Length field. Click “Calculate”. Your answer should be 7.11 yards. Note: The Concrete Volume Calculator can also be used to determine yardage for aggregate products.

How much does it cost to pour a 20×30 concrete slab?

The average cost of a 20×30 concrete slab is between $2,400 and $4,800. The median price is about $3,600. However, the thickness of the slab and other features may increase or lower the cost.

How many 80lb bags of concrete make a yard?

One 80lbs bag of Quikrete Concrete Mix will yield approximately . 60 cu ft. So it will take 45 bag to equal one cubic yard of concrete.

Do you need rebar for 4 inch slab?

The thickness of rebar should be no more than 1/8 that of the slab, so a 4” slab shouldn’t have steel greater than #4 or 1/2″ bar. It’s best to check with a Structural Engineer if your slab will bridge or cantilever. What is this? For 4” concrete slabs used for driveways and patios, #3 rebar is common.

Can you pour concrete directly on dirt?

Long story short, yes you can pour concrete over dirt.

How much does it cost to pour a 20×20 concrete slab?

But how much does a 20×20 concrete slab cost? You can expect to pay between $1,600 and $3,200 for a 20×20 slab. The estimates are based on the average cost of $4 to $8 per square foot for a concrete slab. Yet, the costs may vary.

How many bags of concrete do I need for a 10×8 slab?

Regarding this, “how many bags of concrete do I need for a 10×8 slab?”, at 4 inches thick, generally you will need approximately either 58 bags of 60lb or 45 bags of 80lb of premixed concrete for a 10×8 slab, at 5 inches thick slab, either 73 bags of 60lb or 56 bags of 80lb premixed concrete are required, while at 6.

How many bags of quikrete do I need for a 10×10 slab?

The thickness of your 10′ x 10′ slab will determine just how many bags you need. The average thickness of a 10′ x 10′ concrete slab for a shed is 4 inches thick. At 4″ thick, your 10 x 10 slab will take 56 bags of concrete that weigh 80 lbs.

What happens if you add sugar to concrete?

In simple terms, sugar acts as a retarder and delays the setting time of concrete. Sugars have been categorized as ‘cement destroyers’ and when sugar is added to Portland cement paste at the onset of mixing, hardening may be delayed indefinitely. Concrete hardens due to formation of calcium silicate hydrate.

How many square feet is a yard of concrete 6 inches thick?

One Cubic Yard of Concrete: 4-inches thick – covers 81 square feet. 5-inches thick – covers 65 square feet. 6-inches thick – covers 54 square feet.

How much would it cost to pour a 10×20 concrete slab?

Cost of concrete per square foot Slab Size Square Feet Average Cost 10×10 100 $600 10×12 120 $720 10×20 200 $1,200 12×12 144 $864.

How thick should a concrete driveway be?

As for thickness, non-reinforced pavement four inches thick is standard for passenger car driveways. For heavier vehicles, a thickness of five inches is recommended. To eliminate standing water, the driveway should be sloped towards the street a minimum of one percent, or 1/8 inch per foot, for proper drainage.

How thick should a concrete slab be?

Standard concrete floor slab thickness in residential construction is 4 inches. Five to six inches is recommended if the concrete will receive occasional heavy loads, such as motor homes or garbage trucks. To prepare the base, cut the ground level to the proper depth to allow for the slab thickness.

How thick should a concrete patio be?

Four inches is the minimum thickness for a concrete patio. You’ll want to make it six to eight inches thick if the patio will support a structure such as a gazebo or hot tub.

How thick should a concrete garage floor be?

The concrete slab should be four inches thick at least; it needs to be thicker if heavy equipment will rest on it. Building codes offer requirements for the concrete mix, which vary by region. The standards are expressed in terms of “compressive strength,” which boils down to the amount of water used in the mix.