The average cost of concrete is $117 per cubic yard, with a typical range between $104 and $144 per cubic yard. When you order less than a truckload of concrete, you’ll be charged a short load fee that averages around $43 per cubic yard.
How many bags of cement do I need for 1 cubic yard?
You will need 45 bags of concrete mix to make a cubic yard of concrete. There’s 27 cubic feet of concrete in a cubic yard.
Is it cheaper to pour your own concrete?
Is It Cheaper to Pour Concrete Yourself? Whether you’re pouring concrete countertops or a patio out back, it may be cheaper to pour concrete yourself rather than hiring someone. The materials needed to pour concrete yourself cost about $1.76 per square foot, based on data from Porch.com.
How much concrete do I need for a 10×10 slab?
The amount you will need for a 10 x 10 slab is 1.3 cubic yards, we always add an extra 10% to allow for any slab depth variations or spills that may occur.
How much does it cost to pour a 24×24 slab of concrete?
A typical 24×24 garage slab costs between $3,057 and $5,944 with prices ranging from $5.31 to $8.31 per square foot for a 4” reinforced slab of concrete, and $6.83 to $10.32 per square foot for a 6” slab of reinforced concrete.
How many yards of concrete do I need for a 24×24 slab?
For example, for a concrete slab that is 24′ X 24′ X 4”, simply enter 4 in the Thickness/Depth field, 24 in the Width field, and 24 in the Length field. Click “Calculate”. Your answer should be 7.11 yards. Note: The Concrete Volume Calculator can also be used to determine yardage for aggregate products.
How many 80 bags of concrete make a yard?
One 80lbs bag of Quikrete Concrete Mix will yield approximately . 60 cu ft. So it will take 45 bag to equal one cubic yard of concrete.
Do you need rebar for 4 inch slab?
The thickness of rebar should be no more than 1/8 that of the slab, so a 4” slab shouldn’t have steel greater than #4 or 1/2″ bar. It’s best to check with a Structural Engineer if your slab will bridge or cantilever. What is this? For 4” concrete slabs used for driveways and patios, #3 rebar is common.
Can you pour concrete directly on dirt?
Long story short, yes you can pour concrete over dirt.
How much does it cost to pour a 20×20 concrete slab?
But how much does a 20×20 concrete slab cost? You can expect to pay between $1,600 and $3,200 for a 20×20 slab. The estimates are based on the average cost of $4 to $8 per square foot for a concrete slab. Yet, the costs may vary.
How many square feet is a yard of concrete 4 inches thick?
One Cubic Yard of Concrete: 4-inches thick – covers 81 square feet.
How thick should a concrete patio be?
Four inches is the minimum thickness for a concrete patio. You’ll want to make it six to eight inches thick if the patio will support a structure such as a gazebo or hot tub.
How thick should my concrete slab be?
Standard concrete floor slab thickness in residential construction is 4 inches. Five to six inches is recommended if the concrete will receive occasional heavy loads, such as motor homes or garbage trucks. To prepare the base, cut the ground level to the proper depth to allow for the slab thickness.
How many sq ft does a yard of concrete cover?
How much concrete is in a yard? Concrete volume is measured in cubic yards. When poured on a perfectly level surface, one cubic yard will cover 27 square feet at one foot thick.
How much concrete do I need for a 30×30 slab?
18 yards of 3000 psi concrete mix @ 135.00 per yard. Wire mesh reinforcement. A double row of #4 rebar around the edges. Labor to form the slab.
How much will my concrete slab cost?
Cost of a Concrete Slab Expect to pay a base cost of around $6 per square foot for the material itself, or within a range of $4 to $8 per square foot depending on factors like labor and concrete thickness.
How thick should a concrete driveway be?
As for thickness, non-reinforced pavement four inches thick is standard for passenger car driveways. For heavier vehicles, a thickness of five inches is recommended. To eliminate standing water, the driveway should be sloped towards the street a minimum of one percent, or 1/8 inch per foot, for proper drainage.
How many yards of concrete does a concrete truck hold?
Each cubic yard costs about $65. However, a fully loaded cement truck will hold 10 cubic yards—and partial “short” loads cost $15 to $20 extra for every cubic yard less than a full load.
How many bags of concrete do I need for a 10×10 slab 4 inches thick?
The thickness of your 10′ x 10′ slab will determine just how many bags you need. The average thickness of a 10′ x 10′ concrete slab for a shed is 4 inches thick. At 4″ thick, your 10 x 10 slab will take 56 bags of concrete that weigh 80 lbs.
How much cement do I need for a 12×12 slab?
Regarding this, “how much concrete do I need for a 12×12 slab?”, at 4 inches thick, generally you will need approximately 1.76 cubic yards or 47.52 cubic feet or 1.35 m3 (either 104 bags of 60lb or 80 bags of 80lb) of premixed concrete for a 12×12 slab, at 5 inches thick slab, 2.22 cubic yards or 59.90 cubic feet or.
How many bags of concrete do I need for a 4×4 slab?
As per calculation, for a 4×4 slab at 4 inch thick, generally you will need approximately either 12 bags of 60lb or 9 bags of 80lb of premixed concrete, at 5 inches thick slab, either 15 bags of 60lb or 11 bags of 80lb premixed concrete are required, while at 6 inches thick slab, either 18 bags of 60lb or 14 bags of.
How do I figure cubic yards?
You can easily calculate cubic yardage by converting all three dimensions of your material into yards and multiplying them. For example, if you dig up a flower bed that is 9 feet long, 3 feet wide and 12 inches deep, you will have one cubic yard of dirt.