QA

Question: How Much Does A 24X30 Concrete Slab Cost

A 24×30-foot slab covers 720 square feet. With an average price of $6 per square foot, you may pay about $4,320 for a slab foundation. However, the price can range from $4 to $8 per square foot, resulting in a total cost between $2,880 and $5,760.

How much does it cost to pour a 20×30 concrete slab?

Concrete Slab Prices By Size Slab Size Square Feet Average Cost Installed 15×15 225 $1,388 20×20 400 $2,468 24×24 576 $3,554 20×30 600 $3,702.

How much concrete do I need for a 30×30 slab?

18 yards of 3000 psi concrete mix @ 135.00 per yard. Wire mesh reinforcement. A double row of #4 rebar around the edges. Labor to form the slab.

How much does it cost to pour a 30×40 concrete slab?

How much does a 30×40 concrete slab cost? The average cost is $4 to $8 per square foot. The median price is about $6 per square foot. Based on these averages, you may pay $4,800 to $9,600 with a median estimate of $7,200.

How much does it cost to pour a 20×20 concrete slab?

But how much does a 20×20 concrete slab cost? You can expect to pay between $1,600 and $3,200 for a 20×20 slab. The estimates are based on the average cost of $4 to $8 per square foot for a concrete slab. Yet, the costs may vary.

How many yards of concrete do I need for a 24×24 slab?

For example, for a concrete slab that is 24′ X 24′ X 4”, simply enter 4 in the Thickness/Depth field, 24 in the Width field, and 24 in the Length field. Click “Calculate”. Your answer should be 7.11 yards. Note: The Concrete Volume Calculator can also be used to determine yardage for aggregate products.

Is it cheaper to build on a slab or piers?

Concrete slabs can be constructed very easily and are cheaper than pier and beam foundations. However, you should know that repairing and maintaining a concrete slab can be more expensive in the long run than taking care of a pier and beam foundation.

How many yards of concrete do I need for a 10×10 slab?

The amount you will need for a 10 x 10 slab is 1.3 cubic yards, we always add an extra 10% to allow for any slab depth variations or spills that may occur.

How much would a concrete slab cost?

Concrete slabs typically cost about $6 per square foot, or between $4 and $8 per square foot including labor. That’s about $5,400, or between $3,600 and $7,200 for a typical 30- by 30-foot slab that’s 6 inches deep. Materials alone cost about $4 per cubic foot.

How thick should a concrete slab be?

Standard concrete floor slab thickness in residential construction is 4 inches. Five to six inches is recommended if the concrete will receive occasional heavy loads, such as motor homes or garbage trucks. To prepare the base, cut the ground level to the proper depth to allow for the slab thickness.

How much does it cost to pour 25 yards of concrete?

Cost Estimator by Amount of Concrete CUBIC YARDS AVERAGE COST TYPICAL COST RANGE 15 $1,760 $1,560 to $2,160 20 $1,920 $2,080 to $2,880 25 $2,080 $2,600 to $3,600 30 $2,240 $3,120 to $4,320.

What does a 30×40 shop cost?

The average 30×40 building kit costs $15,000 but can range anywhere from $13,200 to $18,200 depending on location, building specifications, and optional upgrades.

How many sq ft does a yard of concrete cover?

How much concrete is in a yard? Concrete volume is measured in cubic yards. When poured on a perfectly level surface, one cubic yard will cover 27 square feet at one foot thick.

How much concrete do I need for a 40×60 shop?

How much does a 40×60 concrete slab cost? It would be about $8,500 to $12,000 for a 40×60 foot concrete slab, 6 inches thick. That’s based on national averages of around $5 per square foot for a fully engineered, finished concrete slab, including labor and materials.

How many bags of concrete do I need for a 10×20 slab?

Regarding this, “how much concrete do I need for a 10×20 slab?”, at 4 inches thick, generally you will need approximately 2.44 cubic yards or 66 cubic feet or 1.969 m3 (either 144 bags of 60lb or 111 bags of 80lb) of premixed concrete for a 10×20 slab, at 5 inches thick slab, 3.07 cubic yards or 83 cubic feet or 2.35.

Why is concrete so expensive?

As more areas become industrialized—and as there grows a greater need for durable building materials to withstand severe weather and long-term wear—the demand for concrete has significantly increased. This alone has affected the price of concrete over the years.

How many bags of concrete do I need for a 10×10 slab 4 inches thick?

The thickness of your 10′ x 10′ slab will determine just how many bags you need. The average thickness of a 10′ x 10′ concrete slab for a shed is 4 inches thick. At 4″ thick, your 10 x 10 slab will take 56 bags of concrete that weigh 80 lbs.

How many 80lb bags of concrete make a yard?

One 80lbs bag of Quikrete Concrete Mix will yield approximately . 60 cu ft. So it will take 45 bag to equal one cubic yard of concrete.

How thick should a concrete patio be?

Four inches is the minimum thickness for a concrete patio. You’ll want to make it six to eight inches thick if the patio will support a structure such as a gazebo or hot tub.