Table of Contents
Each cubic yard costs about $65. However, a fully loaded cement truck will hold 10 cubic yards—and partial “short” loads cost $15 to $20 extra for every cubic yard less than a full load.
How many yards does a truck of concrete hold?
Concrete trucks weigh an average of 25,000 lbs. by themselves and up to 40,000 lbs. when carrying a full load. Their capacity is around 8 cubic yards, but can be up to 10 cubic yards if fully-loaded.
How many cubic feet of concrete does a concrete truck hold?
Most concrete trucks can hold between 11 and 15 cubic yards of concrete. However, weight limits on roads often limit the amount they can carry to 8 to 11 cubic yards.
How much does it cost to pour a 24×24 slab of concrete?
A typical 24×24 garage slab costs between $3,057 and $5,944 with prices ranging from $5.31 to $8.31 per square foot for a 4” reinforced slab of concrete, and $6.83 to $10.32 per square foot for a 6” slab of reinforced concrete.
How many yards of concrete do I need for a 24×24 slab?
For example, for a concrete slab that is 24′ X 24′ X 4”, simply enter 4 in the Thickness/Depth field, 24 in the Width field, and 24 in the Length field. Click “Calculate”. Your answer should be 7.11 yards. Note: The Concrete Volume Calculator can also be used to determine yardage for aggregate products.
How much does it cost to pour a 20×30 concrete slab?
The average cost of a 20×30 concrete slab is between $2,400 and $4,800. The median price is about $3,600. However, the thickness of the slab and other features may increase or lower the cost.
Is it cheaper to mix your own concrete?
One of the least expensive ways to get concrete is to mix your own. You can buy bags of the mix from a home improvement store. Otherwise, you risk getting a weaker concrete once it cures, which could lead to cracks or crumbles within a couple of years.
How many 80lb bags of concrete make a yard?
One 80lbs bag of Quikrete Concrete Mix will yield approximately . 60 cu ft. So it will take 45 bag to equal one cubic yard of concrete.
How much concrete do I need for a 30×30 slab?
18 yards of 3000 psi concrete mix @ 135.00 per yard. Wire mesh reinforcement. A double row of #4 rebar around the edges. Labor to form the slab.
How much concrete do I need for a 10×10 slab?
The amount you will need for a 10 x 10 slab is 1.3 cubic yards, we always add an extra 10% to allow for any slab depth variations or spills that may occur.
How thick should a concrete driveway be?
As for thickness, non-reinforced pavement four inches thick is standard for passenger car driveways. For heavier vehicles, a thickness of five inches is recommended. To eliminate standing water, the driveway should be sloped towards the street a minimum of one percent, or 1/8 inch per foot, for proper drainage.
How many square feet is a yard of concrete 4 inches thick?
One Cubic Yard of Concrete: 4-inches thick – covers 81 square feet.
How thick should a concrete slab be?
Standard concrete floor slab thickness in residential construction is 4 inches. Five to six inches is recommended if the concrete will receive occasional heavy loads, such as motor homes or garbage trucks. To prepare the base, cut the ground level to the proper depth to allow for the slab thickness.
How many bags of concrete do I need for a 10×10 slab 4 inches thick?
The thickness of your 10′ x 10′ slab will determine just how many bags you need. The average thickness of a 10′ x 10′ concrete slab for a shed is 4 inches thick. At 4″ thick, your 10 x 10 slab will take 56 bags of concrete that weigh 80 lbs.
Is it cheaper to build on a slab or piers?
Concrete slabs can be constructed very easily and are cheaper than pier and beam foundations. However, you should know that repairing and maintaining a concrete slab can be more expensive in the long run than taking care of a pier and beam foundation.
Why is concrete so expensive?
As more areas become industrialized—and as there grows a greater need for durable building materials to withstand severe weather and long-term wear—the demand for concrete has significantly increased. This alone has affected the price of concrete over the years.
How much would it cost to pour a 30×40 concrete slab?
How much does a 30×40 concrete slab cost? The average cost is $4 to $8 per square foot. The median price is about $6 per square foot. Based on these averages, you may pay $4,800 to $9,600 with a median estimate of $7,200.
How much does it cost to pour a 20×20 concrete slab?
But how much does a 20×20 concrete slab cost? You can expect to pay between $1,600 and $3,200 for a 20×20 slab. The estimates are based on the average cost of $4 to $8 per square foot for a concrete slab. Yet, the costs may vary.
Is it cheaper to get a concrete truck or bags?
However, a fully loaded cement truck will hold 10 cubic yards—and partial “short” loads cost $15 to $20 extra for every cubic yard less than a full load. For this project, ordering ready-mix would cost from $55 to $120 more than premixed — depending on where you buy your bags and rent your mixer.
How big of a concrete slab Can I pour myself?
Consider that just 1 cubic yard of concrete, weighing about 4000 lbs, is enough to just create a 6″ thick slab for an area about 7′ by 8′. If your “large” was something like a 2 car garage floor, of 24′ x 30.