How Long To Wait To Drive On New Asphalt Driveway

It is best to wait at least 24 hours before driving on the new surface. We often advise that you wait longer during hot weather. Following installation, be sure to follow a regular preventative maintenance plan, including sealcoating and crack filling, to keep your asphalt looking its best.

How long does it take for asphalt to dry?

Since asphalt needs time to harden and cure, usually 6-12 months, your parking lot or driveway will remain soft and pliable until then. You may walk on the new pavement immediately, but keep automobile traffic off of it for at least 3 full days and longer in hotter temperatures.

What happens if you drive on asphalt too soon?

DO NOT Drive on Fresh Asphalt for at Least 24 Hours If you drive on freshly laid asphalt too soon you could cause ruts and dips to appear. Ruts and dips will hold water and debris which will cause additional damage to your asphalt.

How soon after asphalt is laid should it be sealed?

After laying asphalt, you should wait at least 30 days before sealing your commercial parking lot. For residential parking lots, it is best to wait 90 days. Otherwise, you risk sealing your new asphalt before it is hard enough to withstand elements like power steering.

Is 2 inches of asphalt enough for a driveway?

Residential driveways typically use 2 to 3 inches of asphalt with 3 being suitable for occasional large trucks or heavy equipment. Underneath the asphalt you should have 6 to 8 inches of granular base aggregate. Underneath this you have soil.

Will rain ruin new asphalt?

In general, asphalt cannot be installed when it is raining. When rain comes into contact with fresh asphalt, it causes the oil to rise to the surface which can affect the curing time and the finished product. If asphalt is paved while it’s raining, it can reduce the overall quality of the asphalt.

What temperature does asphalt cure?

Asphalt starts to cure once it cools, typically at about 220 degrees Fahrenheit; once it reaches 185 degrees, asphalt becomes too stiff and dense for proper compaction.

How long does it take for asphalt to dry after rain?

While your driveway may be dry a day after paving, it still needs some time to cure. Typically, you want to keep the pavement dry for at least two days, minimally, so make sure that rain isn’t going to be an issue before you start your driveway paving in this situation.

Why is my new asphalt driveway not smooth?

If your asphalt isn’t smooth and there are loose rocks scattered over the surface, or if you can kick loose small bits of asphalt or aggregate, it’s very likely your pavement wasn’t compacted properly. Asphalt compaction is extremely important because it removes the air from your asphalt.

Why do they put sand on new asphalt?

Asphalt cement is the binder, or glue, that holds together the sand and stones that make up a blacktop drive, road or parking lot. The stones and sand in blacktop are immune to UV damage from the sun.

Should you seal a brand new asphalt driveway?

For starters, never seal a new asphalt driveway. Asphalt needs a minimum of six months for the oils in it to evaporate. If you apply driveway sealer before your asphalt has time to cure, it won’t achieve the necessary hardness and all your work will be for naught.

How do you take care of a new asphalt driveway?

To get the most life and best appearance from an asphalt driveway, clean the driveway at least twice a year. Use a stiff broom and strong hose spray to remove all dirt and debris. Seal-coat the asphalt every two to five years to ensure an attractive, water-resistant surface.

How often should asphalt driveway be sealed?

Asphalt driveways should be resealed about once every three years to maintain their appearance and protect them from cracks and oil damage. As with concrete, finish the repairs, allow time for curing and clean before sealing. Asphalt sealer comes in 5-gallon drums that sell from about $8 to $20.

How do you prepare the ground for an asphalt driveway?

The Complete 7-Step Process for Asphalt Pavement Installation Step 1: Demolition and Removal. Step 2: Grading and Sloping. Step 3: Prepare the Sub Base. Step 4: Proof Roll, Undercutting and Sub Base Repair. Step 5: Binder and Surface Course. Step 6: Install New Asphalt Surface. Step 7: Butt Joints and Transitions.

How many inches should a blacktop driveway be?

A full-depth asphalt driveway is one that is made entirely of asphalt. The asphalt paving mixture is used from the soil subgrade to the top layer. For most cases, this top layer of asphalt of four inches or more is considered “adequate,” while 5-6 inches results in a driveway that is stronger and more stable.

Does thicker asphalt last longer?

Adding extra blacktop thickness will not significantly extend the life of the surface. Keep in mind that blacktop is available in many different blends and mixtures. Each mixture has its own recipe of the sand, gravel and liquid asphalt components. Talk with each contractor and ask which blend is best for your area.