It is best to wait at least 24 hours before driving on the new surface. We often advise that you wait longer during hot weather. Following installation, be sure to follow a regular preventative maintenance plan, including sealcoating and crack filling, to keep your asphalt looking its best.
How long does it take for asphalt to dry?
Since asphalt needs time to harden and cure, usually 6-12 months, your parking lot or driveway will remain soft and pliable until then. You may walk on the new pavement immediately, but keep automobile traffic off of it for at least 3 full days and longer in hotter temperatures.
What happens if you drive on asphalt too soon?
DO NOT Drive on Fresh Asphalt for at Least 24 Hours If you drive on freshly laid asphalt too soon you could cause ruts and dips to appear. Ruts and dips will hold water and debris which will cause additional damage to your asphalt.
How soon after asphalt is laid should it be sealed?
After laying asphalt, you should wait at least 30 days before sealing your commercial parking lot. For residential parking lots, it is best to wait 90 days. Otherwise, you risk sealing your new asphalt before it is hard enough to withstand elements like power steering.
Is it OK to rain on new asphalt?
In general, asphalt cannot be installed when it is raining. When rain comes into contact with fresh asphalt, it causes the oil to rise to the surface which can affect the curing time and the finished product. If asphalt is paved while it’s raining, it can reduce the overall quality of the asphalt.
What temperature does asphalt cure?
Asphalt starts to cure once it cools, typically at about 220 degrees Fahrenheit; once it reaches 185 degrees, asphalt becomes too stiff and dense for proper compaction.
Does asphalt cure in cold weather?
The Ideal Temp for Asphalt Installation During installation, cold temperatures can prevent asphalt from properly binding which causes raveling. Extreme heat can cause new asphalt to melt, slough, bruise and won’t allow asphalt to properly cure. Both extreme cold and extreme heat make for a poor asphalt installation.
How often should asphalt driveway be sealed?
Asphalt driveways should be resealed about once every three years to maintain their appearance and protect them from cracks and oil damage. As with concrete, finish the repairs, allow time for curing and clean before sealing. Asphalt sealer comes in 5-gallon drums that sell from about $8 to $20.
Should you seal a brand new asphalt driveway?
For starters, never seal a new asphalt driveway. Asphalt needs a minimum of six months for the oils in it to evaporate. If you apply driveway sealer before your asphalt has time to cure, it won’t achieve the necessary hardness and all your work will be for naught.
Should new asphalt be sealed?
When it comes to value, there is no better choice. However, you don’t need to seal a new driveway. It is important to allow the asphalt to fully cure. In fact, it is not unusual to wait for between 6 to 9 months before applying a seal coat, especially if your driveway was installed in the fall.
Why do you water new asphalt?
When the temperature is high, the asphalt will become more pliable and will scar easily if you drive over it. Watering the new asphalt is a way to harden the asphalt again in hot weather so it is usable.
Should you water fresh asphalt?
Even when cured, asphalt can sometimes soften in extremely hot weather and harden as temperatures fall. To temporarily harden hot asphalt, you can water it down with a garden hose. Do not be alarmed if soapsuds appear. Large, heavy vehicles can depress your new asphalt and create ruts in your new blacktop.
How long should asphalt cure before rain?
Generally, new asphalt can get wet after 24 hours, with two to three days being ideal. Rain is the enemy of asphalt when paving. Rain will make asphalt dry slower, and working during rain will damage asphalt in most cases. So, when paving, try to look for a few sunny days before rain.
How hot is asphalt on a 100 degree day?
On a sunny day, asphalt can quickly heat up, even if the air temperature doesn’t feel super hot to you. For example, if it’s 85 degrees, then the blacktop temperature is 110. If the air temperature is over 100 degrees, then the blacktop can reach 160 degrees.
How cold is too cold for asphalt?
During initial application, the asphalt should still be at least 220 to 290-degrees Fahrenheit. If the asphalt dips below approximately 185-degrees Fahrenheit before compaction is complete, its consistency stiffens up too much to finish the job properly.
How long does asphalt last in truck?
4 Factors That Affect The Longevity Of Your Driveway Typically, an asphalt driveway lasts 15 to 30 years. This can vary depending on a number of factors including but not limited to: Proper Installation. Type of usage (residential or commercial)May 18, 2020.
What time of year is best to pave a driveway?
The best time of year to pave asphalt is during the spring and summer months because the best temperature for hot paving is generally 70 degrees Fahrenheit or higher. It’s possible to lay asphalt at temperatures as low as 50 degrees, but doing so isn’t likely to bring about the best results possible.
How hot is asphalt on a 90 degree day?
And when it’s upwards of 90 degrees outside, the asphalt of streets and parking lots can reach much more dangerous temperatures, around 150 degrees! That’s warm enough to burn skin, including your pet’s.
Does asphalt expand contract?
Asphalt is a flexible pavement. The strength comes from a limestone aggregate base with 2-3” of an asphalt surface. Being flexible and able to expand and contract, asphalt does not require expansion joints. Asphalt requires some maintenance every 3-5 years.
How much does a 5 gallon bucket of driveway sealer cover?
How Much Does a 5-Gallon Bucket of Driveway Sealer Cover? Each gallon of sealer will cover roughly 80 square feet of pavement.
Is it better to spray or brush driveway sealer?
Sprayers provide better control of the amount of sealant used, making the application process more precise. Squeegee machines take a little longer than sprayers, but hand squeegees are the most timeconsuming. On many jobs, it will take twice as long for workers to apply sealcoating by hand.