If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails.
Do Specifications govern over Drawings?
In order to resolve discrepancies between specifications and drawings, the contract included the following: General requirements, which stated “in case of differences between project specifications and the accompanying drawings, the specifications will govern.”Aug 28, 2017.
What is order of precedence in contracts?
An order of precedence clause is a term which identifies the order in which the various contract documents are prioritized when resolving a conflict or ambiguity within said contract documents. Not all construction contracts contain such a clause.
What takes precedence Drawings or bill of quantities?
If the contract is with quantities, the BoQ as prepared by the Employer takes precedence over the drawings and specification. Any missing items from the BoQ are dealt with as a change and therefore a client risk.
What are Drawings and Specifications?
Construction Drawings and Specifications are the documents used to convey the intent of Consultant for the purposes of constructing the Project. Sample 1. Based on 1 documents.
What is the relationship between specification document and drawing?
The drawings reflect what the project specifications are unlikely to cover; and the project specifications indicate what the drawings are unlikely to portray. Specifications are also sometimes used to further clarify details that are not adequately covered by the drawings and notes on the drawings.
What are the two general means of resolving conflicts between the plans and specifications?
There are two effective strategies when it comes to resolving disputes in construction: compromise and problem-solve. The first means parties give up or give in until they meet in the middle, while the second means parties work together to find an alternative solution.
What happens when two contracts contradict each other?
If the two conditions are indeed contradictory, they will reject each other and either the court will fill the void with a reasonable period of time, or the court will cancel the entire contract if it is not possible to terminate the clause in a fair or reasonable manner.
What is the order of precedence for a solicitation or contract in accordance with FAR 52.215 8?
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order: (a) The Schedule (excluding the specifications). (b) Representations and other instructions.
What are Specifications in construction?
According to the Dictionary of Architecture & Construction a specification is, “a written document describing in detail the scope of work, materials to be used, methods of installation, and quality of workmanship for a parcel of work to be placed under contract; usually utilized in conjunction with working (contract) Aug 7, 2020.
What is limit of retention in construction?
What is the ‘Limit of Retention Money? Retention sum is subjected to limit as per the stated percentage in the contract which is known as ‘Limit of Retention’. In general, ‘Limit of Retention’ is 5% of the contract sum. Therefore once the Limit of Retention is reached, you cannot deduct further Retention Money.
What happens when there is a discrepancy in the drawing or contract documents?
The Owner shall make the necessary correction. If the Contractor, without notifying the Owner of such discrepancy, performs his work according to the drawings notwithstanding such discrepancy, the Owner may direct the Contractor to redo his work without an adjustment of his Contract Price and his Contract Time.
What’s the difference between plans and specifications?
Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things. Ideally, your bank or appraiser picked this up when they reviewed the plans and specs.
Why do designers and contractors use schedules in architectural drawings?
Schedules. These documents show a listing of materials and products necessary for the structure, and the order of installation. Typical schedules include doors and windows and room finish schedules. The ability to read and understand architectural drawings in an essential skill for those working in the building trades.
What is the purpose of revision numbers on the drawing?
As the component or system is modified, and the drawing is updated to reflect the changes, the revision number is increased by one, and the revision number in the revision block is changed to indicate the new revision number.
What type of drawing is used for working drawings?
They may include architectural drawings, structural drawings, civil drawings, mechanical drawings, electrical drawings, and so on. Traditionally, working drawings consist of two-dimensional orthogonal projections of the building or component they are describing, such as plans, sections and elevations.
Why is it important to know how do you draw and interpret working drawings?
It can be difficult to translate an idea from the mind to the canvas, so working drawings allow the artist to revise the work and re-draw to develop a composition, working through problems as they occur. As an artist, it’s important not to let an awareness of that fact intrude on the function of your drawings.
What is the difference between shop drawings and working drawings?
Working drawings help to represent components and communicate with end clients. Shop drawings, on the other hand, are used by fabricators to know how the components will be manufactured and installed during the construction process.
How do you resolve conflict in construction?
The possible ADR processes available to construction disputes are: mediation; adjudication; arbitration; expert determination and court proceedings. Each possible method will be considered in turn. It is common (and advisable) for a construction contract to specify one or more methods of dispute resolution.
How can construction projects avoid disputes?
7 Tips for Avoiding Construction Disputes 1- Draft contracts carefully. 2- Monitor jobs closely. 3- Have an accurate schedule. 4- Stay up to speed with applicable laws and regulations. 5- Train project managers. 6- Consider alternative project delivery methods. 7- Take advantage of technology.
How do you resolve a construction dispute?
Construction dispute resolution methods Negotiation. Mediation. Expert determination. Adjudication. Arbitration. Litigation.
What is contra Proferentem rule?
The contra proferentem principle essentially states that if there is any doubt about the meaning or scope of an exclusion clause, the ambiguity should be resolved against the party seeking to rely on the exclusion clause on the basis that parties are not lightly to be taken to have intended to cut down the remedies the Jun 8, 2017.
Can there be a contract with conflicting terms?
Conflicting terms in a contract exist when there are certain provisions that cannot each be complied with because performing one would violate another, or where the use and meaning of a particular term or terms varies throughout the contract.