Table of Contents
In certain communities, batch concrete, delivered, goes for around $80 per cubic yard. In higher demand areas, it can run as $150 or more per cubic yard. An 80-lb. bag of concrete costs between $3.50 and $4 in 2015, so you could spend anywhere from $161 to $184, plus sales tax, to buy enough bags to make a cubic yard.
How much does it cost to pour a 24×24 slab of concrete?
A typical 24×24 garage slab costs between $3,057 and $5,944 with prices ranging from $5.31 to $8.31 per square foot for a 4” reinforced slab of concrete, and $6.83 to $10.32 per square foot for a 6” slab of reinforced concrete.
How much does it cost to pour a 20×30 concrete slab?
The average cost of a 20×30 concrete slab is between $2,400 and $4,800. The median price is about $3,600. However, the thickness of the slab and other features may increase or lower the cost.
How much is a yard of concrete 2020?
The average cost of concrete is $117 per cubic yard, with a typical range between $104 and $144 per cubic yard. When you order less than a truckload of concrete, you’ll be charged a short load fee that averages around $43 per cubic yard.
How much is a yard of concrete in my area?
Cost. Use $90 per cubic yard as a ballpark figure for concrete prices, but concrete slab cost will vary by region. Also, expect a fee of about $60 per load for delivery from a concrete truck for concrete cost. There could be other fees for such things as Saturday concrete truck delivery and small loads.
How much concrete do I need for a 30×30 slab?
18 yards of 3000 psi concrete mix @ 135.00 per yard. Wire mesh reinforcement. A double row of #4 rebar around the edges. Labor to form the slab.
How many yards of concrete do I need for a 24×24 slab?
For example, for a concrete slab that is 24′ X 24′ X 4”, simply enter 4 in the Thickness/Depth field, 24 in the Width field, and 24 in the Length field. Click “Calculate”. Your answer should be 7.11 yards. Note: The Concrete Volume Calculator can also be used to determine yardage for aggregate products.
Why is concrete so expensive?
As more areas become industrialized—and as there grows a greater need for durable building materials to withstand severe weather and long-term wear—the demand for concrete has significantly increased. This alone has affected the price of concrete over the years.
How much would it cost to pour a 30×40 concrete slab?
How much does a 30×40 concrete slab cost? The average cost is $4 to $8 per square foot. The median price is about $6 per square foot. Based on these averages, you may pay $4,800 to $9,600 with a median estimate of $7,200.
How thick should a concrete slab be?
Standard concrete floor slab thickness in residential construction is 4 inches. Five to six inches is recommended if the concrete will receive occasional heavy loads, such as motor homes or garbage trucks. To prepare the base, cut the ground level to the proper depth to allow for the slab thickness.
How much concrete do I need for a 10×10 slab?
The amount you will need for a 10 x 10 slab is 1.3 cubic yards, we always add an extra 10% to allow for any slab depth variations or spills that may occur.
How many 80lb bags of concrete make a yard?
One 80lbs bag of Quikrete Concrete Mix will yield approximately . 60 cu ft. So it will take 45 bag to equal one cubic yard of concrete.
Is it cheaper to make your own concrete?
One of the least expensive ways to get concrete is to mix your own. Otherwise, you risk getting a weaker concrete once it cures, which could lead to cracks or crumbles within a couple of years. Consider renting a truck, since mixing the bags one at a time limits your ability to get consistent results.
How do you calculate concrete yards?
How do I calculate how much concrete I need for a slab? Measure the area in feet. Multiply length by width, and then by thickness. Divide the resulting number by 27 to find cubic yards.
How much is a cubic yard?
A cubic yard is the volume of a cube with the length, width and height of one yard (3 feet or 36 inches). One cubic yard is equal to 27 cubic feet. To help you picture this, the volume of two washing machines is just over a cubic yard. Because of their shape, dumpster volume is calculated in cubic yards.
How many square feet is 3 cubic yards?
Cubic yard to Square feet Calculator 1 cubic yard = 9 ft 2 0.037 cubic yard 3 cubic yard = 18.7208 ft 2 0.1925 cubic yard 4 cubic yard = 22.6786 ft 2 0.2963 cubic yard 5 cubic yard = 26.3162 ft 2 0.4141 cubic yard 6 cubic yard = 29.7173 ft 2 0.5443 cubic yard.
How much does it cost to pour a 20×20 concrete slab?
But how much does a 20×20 concrete slab cost? You can expect to pay between $1,600 and $3,200 for a 20×20 slab. The estimates are based on the average cost of $4 to $8 per square foot for a concrete slab. Yet, the costs may vary.
How many square feet is a yard of concrete 4 inches thick?
One Cubic Yard of Concrete: 4-inches thick – covers 81 square feet.
How many bags of concrete do I need for a 10×8 slab?
Regarding this, “how many bags of concrete do I need for a 10×8 slab?”, at 4 inches thick, generally you will need approximately either 58 bags of 60lb or 45 bags of 80lb of premixed concrete for a 10×8 slab, at 5 inches thick slab, either 73 bags of 60lb or 56 bags of 80lb premixed concrete are required, while at 6.