Question: How Much Is 10 Cubic Yards Of Concrete

How many bags of concrete is 10 cubic yards?

For 10 Cubic Yards If you’re using 60-pound bags of ready-mix concrete you will need 60 bags per yard. While for 80-pound bags of ready-mix concrete you will need forty-five bags per yard. For 90-pound bags of ready-mix concrete you will need forty-one bags per yard.

How much concrete do I need for a 10×10 slab?

The amount you will need for a 10 x 10 slab is 1.3 cubic yards, we always add an extra 10% to allow for any slab depth variations or spills that may occur.

How much is the average cubic yard of concrete?

Concrete costs an average of $117 per cubic yard, with a typical range between $104 and $144 per cubic yard. Concrete costs per yard will vary depending on how far you live from the delivery company, how much concrete you order, and the type of concrete you need.

How many bags of concrete do I need for 1 cubic yard?

One 80lbs bag of Quikrete Concrete Mix will yield approximately . 60 cu ft. So it will take 45 bag to equal one cubic yard of concrete. If you have a project over a 1/2 a cubic yard you should consider our Mix On-site Concrete especially if you are hand mixing.

How many yards of concrete do I need for a 24×24 slab?

For example, for a concrete slab that is 24′ X 24′ X 4”, simply enter 4 in the Thickness/Depth field, 24 in the Width field, and 24 in the Length field. Click “Calculate”. Your answer should be 7.11 yards. Note: The Concrete Volume Calculator can also be used to determine yardage for aggregate products.

How much concrete do I need for an 8×10 slab?

One may ask a reasonable question, “how many cubic feet of concrete do I need for a 10×10 slab?”, generally there are 33.21 cubic feet of premixed concrete you will need for a 10×10 slab at 4 inches thick, at 5 inches thick you will need 41.58 cubic feet of concrete and at 6 inches thick – 49.95 cubic feet of concrete.

How many 80 bags of concrete make a yard?

If you’re using 80lb bags of concrete, you’ll need 45 bags to make a yard.

How many yards is a 10×10 slab?

10 x 10 = 100 square feet. 4 ÷ 12 = .33. 100 x .33 = 33 cubic feet. 33 x .037 = 1.22 cubic yards.

How much would it cost to pour a 10×20 concrete slab?

Cost of concrete per square foot Slab Size Square Feet Average Cost 10×10 100 $600 10×12 120 $720 10×20 200 $1,200 12×12 144 $864.

How much does it cost to pour a 24×24 slab of concrete?

A typical 24×24 garage slab costs between $3,057 and $5,944 with prices ranging from $5.31 to $8.31 per square foot for a 4” reinforced slab of concrete, and $6.83 to $10.32 per square foot for a 6” slab of reinforced concrete.

Is it cheaper to pour your own concrete?

Is It Cheaper to Pour Concrete Yourself? Whether you’re pouring concrete countertops or a patio out back, it may be cheaper to pour concrete yourself rather than hiring someone. The materials needed to pour concrete yourself cost about $1.76 per square foot, based on data from Porch.com.

Why is concrete so expensive?

As more areas become industrialized—and as there grows a greater need for durable building materials to withstand severe weather and long-term wear—the demand for concrete has significantly increased. This alone has affected the price of concrete over the years.

How thick should a concrete slab be?

Standard concrete floor slab thickness in residential construction is 4 inches. Five to six inches is recommended if the concrete will receive occasional heavy loads, such as motor homes or garbage trucks. To prepare the base, cut the ground level to the proper depth to allow for the slab thickness.

How do I figure out how many yards of concrete I need?

How do I calculate how much concrete I need for a slab? Measure the area in feet. Multiply length by width, and then by thickness. Divide the resulting number by 27 to find cubic yards.

How many square feet is a yard of concrete 4 inches thick?

One Cubic Yard of Concrete: 4-inches thick – covers 81 square feet.

How thick should a concrete patio be?

Four inches is the minimum thickness for a concrete patio. You’ll want to make it six to eight inches thick if the patio will support a structure such as a gazebo or hot tub.

How thick should a concrete driveway be?

As for thickness, non-reinforced pavement four inches thick is standard for passenger car driveways. For heavier vehicles, a thickness of five inches is recommended. To eliminate standing water, the driveway should be sloped towards the street a minimum of one percent, or 1/8 inch per foot, for proper drainage.

How much will a cubic yard of concrete cover?

Concrete volume is measured in cubic yards. When poured on a perfectly level surface, one cubic yard will cover 27 square feet at one foot thick.

How many yards of concrete can a truck hold?

Each cubic yard costs about $65. However, a fully loaded cement truck will hold 10 cubic yards—and partial “short” loads cost $15 to $20 extra for every cubic yard less than a full load.

How many bags of quikrete do I need for a 10×10 slab?

The thickness of your 10′ x 10′ slab will determine just how many bags you need. The average thickness of a 10′ x 10′ concrete slab for a shed is 4 inches thick. At 4″ thick, your 10 x 10 slab will take 56 bags of concrete that weigh 80 lbs.

How many yards are in a 60 pound bag of concrete?