QA

Do Specs Override Drawings

If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails. It is sort of like a poker hand where 3 of a kind beats 2 pairs, etc.

Do Specifications govern over drawings?

In order to resolve discrepancies between specifications and drawings, the contract included the following: General requirements, which stated “in case of differences between project specifications and the accompanying drawings, the specifications will govern.”Aug 28, 2017.

What is the difference between specs and plans?

Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things. You, the General Contractor, and the sub contractor need to figure out what to do next.

What takes precedence in a contract?

In the event of a conflict between or among the Contract documents, the order of precedence shall be the provisions of the main body of this Contract, i.e., those provisions set forth in the recitals and articles of this Contract, and then the attachments.

What are drawings and Specifications?

Construction Drawings and Specifications are the documents used to convey the intent of Consultant for the purposes of constructing the Project. Sample 1. Based on 1 documents.

What is the relationship between specification document and drawing?

The drawings reflect what the project specifications are unlikely to cover; and the project specifications indicate what the drawings are unlikely to portray. Specifications are also sometimes used to further clarify details that are not adequately covered by the drawings and notes on the drawings.

What happens when there is a discrepancy in the drawing or contract documents?

The Owner shall make the necessary correction. If the Contractor, without notifying the Owner of such discrepancy, performs his work according to the drawings notwithstanding such discrepancy, the Owner may direct the Contractor to redo his work without an adjustment of his Contract Price and his Contract Time.

What does Spec mean in building?

“Specification: A detailed description of the dimensions, construction, workmanship, materials etc., of work done or to be done, prepared by an architect, engineer etc.”.

What does specs mean in construction?

Construction specifications, also known, as specs, detail the work and workmanship needed to complete a construction project.

What happens when two contracts contradict each other?

If the two conditions are indeed contradictory, they will reject each other and either the court will fill the void with a reasonable period of time, or the court will cancel the entire contract if it is not possible to terminate the clause in a fair or reasonable manner.

What is contra Proferentem rule?

The contra proferentem principle essentially states that if there is any doubt about the meaning or scope of an exclusion clause, the ambiguity should be resolved against the party seeking to rely on the exclusion clause on the basis that parties are not lightly to be taken to have intended to cut down the remedies the Jun 8, 2017.

What is the drafter rule in contract interpretation?

Contra proferentem (Latin: “against [the] offeror”), also known as “interpretation against the draftsman”, is a doctrine of contractual interpretation providing that, where a promise, agreement or term is ambiguous, the preferred meaning should be the one that works against the interests of the party who provided the.

Are the specifications the same as drawings?

Specifications will detail the materials, standards, techniques, and so on required to carry out the works. Construction drawings provide the graphical representation, indicating the arrangement of components, detailing, dimensions, and so on.

What is the purpose of a specification?

The purpose of a specification is to provide a description and statement of the requirements of a product, components of a product, the capability or performance of a product, and/or the service or work to be performed to create a product.

What type of drawing is used for working drawings?

They may include architectural drawings, structural drawings, civil drawings, mechanical drawings, electrical drawings, and so on. Traditionally, working drawings consist of two-dimensional orthogonal projections of the building or component they are describing, such as plans, sections and elevations.

What is working drawing in architecture?

Working drawings are a set of comprehensive architectural drawings which are used in the construction of a building. In addition to the structural drawings and service engineer’s drawings, architectural working drawings are used. The fixing of walls to structural elements can be noticed with these assembly drawings.

Why is it important to know how do you draw and interpret working drawings?

It can be difficult to translate an idea from the mind to the canvas, so working drawings allow the artist to revise the work and re-draw to develop a composition, working through problems as they occur. As an artist, it’s important not to let an awareness of that fact intrude on the function of your drawings.

What is the difference between shop drawings and working drawings?

Working drawings help to represent components and communicate with end clients. Shop drawings, on the other hand, are used by fabricators to know how the components will be manufactured and installed during the construction process.

What takes precedence drawings or bill of quantities?

If the contract is with quantities, the BoQ as prepared by the Employer takes precedence over the drawings and specification. Any missing items from the BoQ are dealt with as a change and therefore a client risk.

What is limit of retention in construction?

What is the ‘Limit of Retention Money? Retention sum is subjected to limit as per the stated percentage in the contract which is known as ‘Limit of Retention’. In general, ‘Limit of Retention’ is 5% of the contract sum. Therefore once the Limit of Retention is reached, you cannot deduct further Retention Money.

What are architects errors and omissions responsibilities?

In some court cases, architects are found financially responsible for errors, especially if work needs to be torn down and redone. However, if the mistake was an omission of work that the owner would have had to pay for anyway, the owner often has to pay. The standard of care provided by the architect is also an issue.