If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails.
Do specifications govern over drawings?
In order to resolve discrepancies between specifications and drawings, the contract included the following: General requirements, which stated “in case of differences between project specifications and the accompanying drawings, the specifications will govern.”Aug 28, 2017.
What is the difference between a drawing and a specification?
Specifications will detail the materials, standards, techniques, and so on required to carry out the works. Construction drawings provide the graphical representation, indicating the arrangement of components, detailing, dimensions, and so on.
What takes precedence in a contract?
In the event of a conflict between or among the Contract documents, the order of precedence shall be the provisions of the main body of this Contract, i.e., those provisions set forth in the recitals and articles of this Contract, and then the attachments.
What is the relationship between specification document and drawing?
The drawings reflect what the project specifications are unlikely to cover; and the project specifications indicate what the drawings are unlikely to portray. Specifications are also sometimes used to further clarify details that are not adequately covered by the drawings and notes on the drawings.
What is limit of retention in construction?
What is the ‘Limit of Retention Money? Retention sum is subjected to limit as per the stated percentage in the contract which is known as ‘Limit of Retention’. In general, ‘Limit of Retention’ is 5% of the contract sum. Therefore once the Limit of Retention is reached, you cannot deduct further Retention Money.
What are the two general means of resolving conflicts between the plans and Specifications?
There are two effective strategies when it comes to resolving disputes in construction: compromise and problem-solve. The first means parties give up or give in until they meet in the middle, while the second means parties work together to find an alternative solution.
Do architects own their drawings?
Thus, while architects and engineers may own their original models, drawings, and specifications, they do not own their designs. Copyrights belong to the author of the work, except works “for hire,” created as part of the author’s employment.
What is a spec drawing?
By definition, drawing notes that describe materials, equipment, systems, standards, or workmanship are specifications. And, though far less common, graphic images that appear on small paper are drawings. Mechanical and electrical drawings (large paper) also frequently include specifications.
What’s the difference between plans and specifications?
Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things. Ideally, your bank or appraiser picked this up when they reviewed the plans and specs.
Which takes precedence contract or purchase order?
Purchase orders should for single short-term purchases, while contracts are better for building long-term buying relationships. And of course, because of the stronger legal value, use contracts with any deals that carry a larger risk.
Does a will take precedence over a contract?
After that date, a will automatically takes precedence. If the beneficiaries of the last will and testament can show that the prenuptial agreement is invalid, the court will not enforce its terms. This might occur if a spouse entered into a prenup under duress.
What is the standard order of precedence of documents in a contract?
Document precedence Quite often, the terms and conditions of the contract take precedence over any clauses in the schedules, the attachments, any documents incorporated by explicit reference or in invoices.
What is the purpose of specifications in a set of working drawings?
According to the Dictionary of Architecture & Construction a specification is, “a written document describing in detail the scope of work, materials to be used, methods of installation, and quality of workmanship for a parcel of work to be placed under contract; usually utilized in conjunction with working (contract) Aug 7, 2020.
What type of drawing is used for working drawings?
They may include architectural drawings, structural drawings, civil drawings, mechanical drawings, electrical drawings, and so on. Traditionally, working drawings consist of two-dimensional orthogonal projections of the building or component they are describing, such as plans, sections and elevations.
What is an order of precedence clause?
An order of precedence clause is a term which identifies the order in which the various contract documents are prioritized when resolving a conflict or ambiguity within said contract documents. Not all construction contracts contain such a clause.
Why do contractors hold retention?
Retention is a percentage (often 5%) of the amount certified as due to the contractor on an interim certificate, that is deducted from the amount due and retained by the client. The purpose of retention is to ensure that the contractor properly completes the activities required of them under the contract.
What is a retention order?
Retention permission is applied for when construction of or alteration to a building has already taken place without planning permission. An individual or developer applies to have the work approved retrospectively.
What is retention sum in construction?
Retention sum is a sum retained by an employer against interim sums payable to the contractors for work done and will be released to the contractor at a later stage upon fulfilment of certain conditions (depends on the terms and conditions of the construction contracts).
What happens when there is a discrepancy in the drawing or contract documents?
The Owner shall make the necessary correction. If the Contractor, without notifying the Owner of such discrepancy, performs his work according to the drawings notwithstanding such discrepancy, the Owner may direct the Contractor to redo his work without an adjustment of his Contract Price and his Contract Time.
How do contractors resolve conflict?
Speak to Your Contractor if Problems Arise. Often, you can simply speak directly to your contractor to settle any disputes or problems that may occur. With discussion and good will, you may be able to resolve the issue without losing time or creating additional expenses for legal procedures.
How do you resolve conflict in construction?
The possible ADR processes available to construction disputes are: mediation; adjudication; arbitration; expert determination and court proceedings. Each possible method will be considered in turn. It is common (and advisable) for a construction contract to specify one or more methods of dispute resolution.
What is the going rate for architects?
Architects’ fees vary widely, depending on the project, the local economy, and the architect’s experience and reputation. Fees typically range from $2,014 to $8,375, with an average of $5,126. But fees can be much higher than that, depending on the size and complexity of the job.
Can you change architect?
People have called me many times asking “Can I replace my architect after we filed with DOB” and the answer is yes of course you can. As a property owner you have the right to fire your architect if you see fit.
What does an architect charge to design a house?
Architect fees are 5% to 20% of construction costs for residential projects (custom homes, remodels, extensions) and 3% to 12% for commercial structures. The average cost to hire an architect is $5,000 to $60,000 to design house plans. Architects charge hourly rates of $100 to $250 to draw plans.