QA

Question: Do Project Submittals Include Shop Drawings

Submittals may include Shop Drawings and Samples; schedules; product data; Owner-delegated designs; sustainable design information; information on special procedures; testing plans; results of tests and evaluations, source quality-control testing and inspections, and field or Site quality-control testing and Dec 1, 2020.

What’s the difference between shop drawings and submittals?

The shop drawing process formalizes the method for a contractor to demonstrate how it will accomplish these design obligations. The submittal process forces the contractor to show how it intends to execute the work and allows the design professional to review those intentions for com- pliance with the design intent.

Are shop drawings submittals?

Submittals in construction management are shop drawings, material data, samples, and product data. Submittals are required primarily for the architect and engineer to verify that the correct products will be installed on the project.

What should be included in a submittal?

Submittal items include schedules, meeting minutes, product data, shop drawings, test data, product samples, warranties, and operations and maintenance (O&M) data. A large project, with dozens of subs, may have 500 or more individual submittals.

Why are shop drawing submittals required?

While the Contract Plans and Specifications (including Supplemental and Special Provisions) define the overall nature of the project, Shop Drawing submittal is the accepted method of approving a specific element of the work while allowing flexibility in the Contractor’s means and methods.

What should be included in shop drawings?

Information required to be included in Shop Drawings Comparison information for the architect and engineer. Notes of changes or alterations from the construction documents. Information needed to fabricate the product. Indication of dimensions needing verification from the jobsite. Placement or installation information.

What is the difference between shop drawings and construction drawings?

However, there is a thin line difference between the construction drawings and shop drawings. Where the shop drawings depict the original design of the building, the construction drawings are modified from time to time. They include the revisions a building has undergone whilst the construction process is underway.

What is a shop drawing schedule?

1 Shop Drawings are drawings, diagrams, schedules, and other data specially prepared for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier, or distributor to illustrate some portion of the Work.

What is the difference between product data and shop drawings?

1: “Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor…” 3.12. 2: “Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor…”May 12, 2006.

Who is responsible for submittals?

A submittal refers to the written and/or physical information provided by a responsible contractor (i.e., contractors and subs) to the general contractor. This information is submitted to the design team for approval of equipment, materials, etc. before they are fabricated and delivered to the project.

Do shop drawings supersede contract drawings?

The fabricator’s drawings are then given to “the shop” for use in making the component – thus the name “shop drawing.” As one court stated, “shop drawings are the final word as to how the work should proceed on the job, and supersede the architectural plans.”Jan 6, 2020.

What is a submittal in architecture?

Construction submittals are defined by bizfluent as “documents submitted by the contractor to the architect for his approval for use in a project,” while Lexology explains that “Submittals consist of information provided by the contractor to the design professional for approval of equipment, materials, etc.

What does a construction submittal look like?

Construction submittals can consist of multiple elements. A submittal can include technical data, samples, shop drawings, production specifications and other written and physical information that will help the engineers, designers, and architects of a project to ensure the correct materials are used in new buildings.

What is the difference between transmittals and submittals?

A submittal is a document, sample, or any other information that is presented for review or consideration, whereas a transmittal is a document that is sent along with other documents or files.

What is the difference between an RFI and a submittal?

An RFI is very similar to a construction submittal and can be sent by a subcontractor when they are creating a submittal that will eventually go forward for approval. This article provides a detailed guide to requests for information and what these requests entail during construction projects.

Who is responsible to review all submittals before submitting to the government?

4. The primary responsibility for overall management and control of submittals lies with the contractor.

What are the 6 types of construction drawings?

What Are the Six Types of Construction Drawings? Plans. Interior and exterior elevations. Building and wall sections. Interior and exterior details. Schedules and room finishes. Framing and utility plans.

What is the difference between shop drawings and IFC drawings?

Shop drawing is a drawing that is produced by the contractor, subcontractor, manufacturer, fabricator or the supplier whereas IFC (Issued for Construction) is a type of drawing issued to the contractor by the client or his/her representative.

What is shop drawing in architecture?

Shop drawings are the set of plans we create to drill down on the details of the architectural and design team’s construction documents. These are the highly detailed drawings that are used to fabricate natural stone into your finished product.

What is included in structural drawings?

Structural drawing A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built. The structural drawings set has different subsets: General Notes, Plans, Elevations, Sections, and Details.

What do construction drawings consist of?

They are the pictorial record of the official design for the building, and generally include detailed depictions of every element of the finished building including the foundation, floor, walls, elevations, interior details and elevations, cabinetry, MEP design, structural details, and ceiling plans.

What is shop drawing in civil engineering?

Shop drawings are detailed and accurate descriptions of design and plans for an equipment or building component meant to be manufactured or installed by a fabrication shop.

What is a shop drawing log?

Shop drawings log is a control document to record and monitor the shop drawings submittals and approvals between the contractor and the consultant or the client.

What does no exceptions taken mean in construction?

No Exception Taken, means that fabrication, manufacture, or construction may proceed providing submittal complies with Contract Documents. Sample 1. Sample 2.