Do drawings supersede specifications?
If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails.
Do specifications govern over drawings?
In order to resolve discrepancies between specifications and drawings, the contract included the following: General requirements, which stated “in case of differences between project specifications and the accompanying drawings, the specifications will govern.”Aug 28, 2017.
What is the order of construction drawings?
The General Order of Drawings in a Set of Construction Plans G for General Sheets: Cover sheet, plan index, and location plans. A for Site and Architectural Plans: Floor plans, ceiling plans, roof plans, elevations, sections, wall sections, and others, depending on the architect’s chosen level of detail.
What is order of precedence in contracts?
An order of precedence clause is a term which identifies the order in which the various contract documents are prioritized when resolving a conflict or ambiguity within said contract documents. Not all construction contracts contain such a clause.
What takes precedence drawings or bill of quantities?
If the contract is with quantities, the BoQ as prepared by the Employer takes precedence over the drawings and specification. Any missing items from the BoQ are dealt with as a change and therefore a client risk.
What is limit of retention in construction?
What is the ‘Limit of Retention Money? Retention sum is subjected to limit as per the stated percentage in the contract which is known as ‘Limit of Retention’. In general, ‘Limit of Retention’ is 5% of the contract sum. Therefore once the Limit of Retention is reached, you cannot deduct further Retention Money.
What is the relationship between specification document and drawing?
The drawings reflect what the project specifications are unlikely to cover; and the project specifications indicate what the drawings are unlikely to portray. Specifications are also sometimes used to further clarify details that are not adequately covered by the drawings and notes on the drawings.
What is the difference between specifications and construction drawings?
Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things.
What are the two general means of resolving conflicts between the plans and specifications?
There are two effective strategies when it comes to resolving disputes in construction: compromise and problem-solve. The first means parties give up or give in until they meet in the middle, while the second means parties work together to find an alternative solution.
What are the 6 types of construction drawings?
What Are the Six Types of Construction Drawings? Plans. Interior and exterior elevations. Building and wall sections. Interior and exterior details. Schedules and room finishes. Framing and utility plans.
What are engineered plans for motors pumps?
Core Module 5: Construction Drawings Vocabulary A B mechanical plan plans for motors, pumps, piping systems and piping equipment civil plan used for work that has to do with construction in or on the earth structural plan support the architectural plan; give details on the materials to be used.
Why might a set of drawings contain a drawing that is drawn to a larger scale than the other drawings?
For construction projects that are too large to be drawn full size on a sheet of paper, everything must be drawn proportionately smaller than it really is. Smaller objects and drawings that must show more detail are drawn to a larger scale. Not all necessary dimensions need to be shown on drawings.
What happens when two contracts contradict each other?
If the two conditions are indeed contradictory, they will reject each other and either the court will fill the void with a reasonable period of time, or the court will cancel the entire contract if it is not possible to terminate the clause in a fair or reasonable manner.
What is the order of precedence for a solicitation or contract in accordance with FAR 52.215 8?
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order: (a) The Schedule (excluding the specifications). (b) Representations and other instructions.
Which operator has highest priority in C?
Priority of operators Priority Operator Type of operation 1 ** Arithmetic prefix +, – Arithmetic prefix ¬ Bit string 2 *, ⁄ Arithmetic.
What happens when there is a discrepancy in the drawing or contract documents?
The Owner shall make the necessary correction. If the Contractor, without notifying the Owner of such discrepancy, performs his work according to the drawings notwithstanding such discrepancy, the Owner may direct the Contractor to redo his work without an adjustment of his Contract Price and his Contract Time.
What is Bill of Quantity in civil engineering?
BoQ means a bill of quantity is a document prepared by a cost estimator to calculate the exact costing of project work by multiplying item work by their rate. It is the most important document for tendering and contracting.
What is takeoff?
1a : to start off or away often suddenly : set out, depart took off for her trip. b : to leave the surface : begin flight.
Why do contractors hold retention?
Retention is a percentage (often 5%) of the amount certified as due to the contractor on an interim certificate, that is deducted from the amount due and retained by the client. The purpose of retention is to ensure that the contractor properly completes the activities required of them under the contract.
What is a retention order?
Retention permission is applied for when construction of or alteration to a building has already taken place without planning permission. An individual or developer applies to have the work approved retrospectively.
Is retention held on variations?
It can be the contract sum with variations or without them. This is important as variations can dramatically alter the value of the work. Often, an upline contractor will include the value of variations and so the retention figure goes up.
What type of drawing is used for working drawings?
They may include architectural drawings, structural drawings, civil drawings, mechanical drawings, electrical drawings, and so on. Traditionally, working drawings consist of two-dimensional orthogonal projections of the building or component they are describing, such as plans, sections and elevations.
What is a detailed drawing engineering?
A detail drawing is a tool used by engineers to communicate their designs to manufacturers and to preserve their work for future generations. To facilitate the sharing of design information, engineers have created uniform standards, protocols and tools. One of these standards is called the ANSI Y14.
What is the purpose of specifications in a set of working drawings?
According to the Dictionary of Architecture & Construction a specification is, “a written document describing in detail the scope of work, materials to be used, methods of installation, and quality of workmanship for a parcel of work to be placed under contract; usually utilized in conjunction with working (contract) Aug 7, 2020.