Table of Contents
If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails.
Do drawings supersede specifications?
Supplement 5252.236-9312, Design Build Contract-Order of Precedence, which showed that specifications took precedence over concept drawings. General requirements, which stated “in case of differences between project specifications and the accompanying drawings, the specifications will govern.”Aug 28, 2017.
What is the relationship between specification document and drawing?
The drawings reflect what the project specifications are unlikely to cover; and the project specifications indicate what the drawings are unlikely to portray. Specifications are also sometimes used to further clarify details that are not adequately covered by the drawings and notes on the drawings.
What are the two general means of resolving conflicts between the plans and specifications?
There are two effective strategies when it comes to resolving disputes in construction: compromise and problem-solve. The first means parties give up or give in until they meet in the middle, while the second means parties work together to find an alternative solution.
Does the contractor have a duty to draw attention to a mistake in a drawing or specification?
43 Does the contractor have a duty to draw attention to an error on the architect’s drawing? Generally and in normal circumstances, the contractor has no liability for design and, therefore, no liability for the production of design drawings.
Do Specifications override drawings?
If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails.
What is the difference between Specifications and construction drawings?
Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things.
What is the purpose of specifications in a set of working drawings?
According to the Dictionary of Architecture & Construction a specification is, “a written document describing in detail the scope of work, materials to be used, methods of installation, and quality of workmanship for a parcel of work to be placed under contract; usually utilized in conjunction with working (contract) Aug 7, 2020.
What is the importance of a drawings?
Drawings are important because they are used to communicate the technical details of a project in a common format. The drawings also become the foundation for future projects and cost savings for customers.
What is working drawing in architecture?
Working drawings are a set of comprehensive architectural drawings which are used in the construction of a building. In addition to the structural drawings and service engineer’s drawings, architectural working drawings are used. The fixing of walls to structural elements can be noticed with these assembly drawings.
How do contractors resolve disputes?
5 Ways to Resolve a Dispute With Your Contractor Check Your Contract. The first step to resolving any dispute with a contractor is to carefully review your contract. Communicate and Negotiate. Mediation. Arbitration. Go to Court. Key Takeaways.
How do you resolve a construction dispute?
The possible ADR processes available to construction disputes are: mediation; adjudication; arbitration; expert determination and court proceedings. Each possible method will be considered in turn. It is common (and advisable) for a construction contract to specify one or more methods of dispute resolution.
How do contractors resolve conflict?
Speak to Your Contractor if Problems Arise. Often, you can simply speak directly to your contractor to settle any disputes or problems that may occur. With discussion and good will, you may be able to resolve the issue without losing time or creating additional expenses for legal procedures.
What responsibility does the architect have in resolving disputes?
Most often, the architect’s role is to review conflicts and proposed changes and submit specific recommendations to the owner for the owner’s action.
Who is responsible for as built drawings?
Who Creates As-Built Drawings? Typically, the architects or designers who originally designed the project will also create the as-builts. They are familiar with the original specifications and are therefore the most qualified to reflect recorded changes.
What are architects liable for?
An engineer or an architect must use the skill and care in the performance of his duties commensurate with the requirements of his profession, and is only liable for a failure to exercise reasonable care and skill commensurate with those requirements.”.
What takes precedence drawings or bill of quantities?
If the contract is with quantities, the BoQ as prepared by the Employer takes precedence over the drawings and specification. Any missing items from the BoQ are dealt with as a change and therefore a client risk.
In which type of contract there is no open competition?
An Other than Full & Open Competition (Called a Sole Source Procurement) is when the government enters into a contract with a contractor without going through the typical competitive process as required by law because it deems that the contractor is the only source available that can meet the government requirements.
In which type of contract extra work is not allowed?
Unbalanced tender can be avoided in the Percentage Rate Contract.
What type of drawing is used for working drawings?
They may include architectural drawings, structural drawings, civil drawings, mechanical drawings, electrical drawings, and so on. Traditionally, working drawings consist of two-dimensional orthogonal projections of the building or component they are describing, such as plans, sections and elevations.
What may happen if architect fails to give the correct specification or no specifications?
Specifications should use technically correct terms, and avoid slang or “field” words. Specifications should avoid fielding conflicting requirements. Specifications should avoid repeating requirements stated elsewhere in the Contract. Confusion may result in some cases when there are exceptions to these understandings.
What is the importance of specifications?
The specification provides clear instructions on project intent, performance and construction. It can reference the quality and standards which should be applied. Materials and manufacturers’ products can be clearly defined. Installation, testing and handover requirements can be identified.
What is the purpose of specification?
The purpose of a specification is to provide a description and statement of the requirements of a product, components of a product, the capability or performance of a product, and/or the service or work to be performed to create a product.
What is the importance of test specifications?
The test specifications for an exam program provide essential planning materials for the test development process. Thorough, thoughtful test specifications can guide the remainder of the test development process, especially item writing efforts and test assembly.